8×20 Deck Plans: Layouts, Materials, Cost, and the Pool Version

Part of our guide

Dave Hendrick
Hardscape & Outdoor Living Editor
12 min read
8×20 Deck Plans: Layouts, Materials, Cost, and the Pool Version
Share Guide:

An 8×20 deck covers 160 sq ft, fits 4 to 6 people with furniture, and needs 17 deck boards, 16 joists, and 6 footings. It is the smallest deck that still works as a real outdoor room instead of a walkway. This guide gives you 3 layouts, the full framing list, the cost in 5 materials, and the 4 changes the plan needs when the deck sits beside a pool.

The 8×20 Deck in 6 Numbers

An 8×20 deck is 160 sq ft of usable surface. The 8 ft width is the number that matters most: it is wide enough for a lounge chair plus a 3 ft walkway, and narrow enough that standard 2×8 joists span it with room to spare.

Number Value Why it matters
Deck area 160 sq ft Seats 4 to 6 people with a small table
Deck boards 17 boards, 20 ft long 340 linear ft before waste
Joists 16 joists, 2×8, 16 in. on center 2×8 joists span 11 ft 10 in., so 8 ft is well inside the limit
Footings 6 footings 3 posts under each of 2 beam lines
Max slope (pool decks) 1/2 in. per ft Code ceiling for deck slope; minimums run 1/8 to 1/4 in. per ft by surface
Installed cost range $640 to $6,080 Overlay at the low end, capped composite at the high end

Most 8×20 plans you find online are generic patio decks. They leave out the pool details that cost money later: the board gap that lets splash water drain, the slope that moves water away from the pool, and the slip rating of the surface under wet bare feet. Those 3 details are covered in the pool section below.

3 Layouts That Fit an 8×20 Footprint

Three layouts cover almost every 8×20 build. Pick by how you will use the deck, not by how the plan looks on paper.

1. Straight run: 8 ft deep, 20 ft long

The straight run is one rectangle against the house or along one side of the pool. It is the cheapest layout to frame because it uses 2 beam lines and no angled cuts. It fits a 6 ft dining table with 4 chairs and leaves a 3 ft walkway behind the chairs. Best for: a deck that runs along a rectangular inground pool or a house wall. Downside: one long rectangle can feel like a corridor if you put furniture at both ends.

2. L-shape: 8×12 plus 8×8

The L-shape splits the 160 sq ft into a 12 ft main run and an 8 ft wing at a right angle. The wing holds a grill or a pair of loungers, and the main run stays clear for walking. Framing costs about 10 to 15 percent more than a straight run because the corner needs 2 extra footings and angled rim boards. Best for: a corner of a yard, or a deck that wraps 2 sides of a small pool. Downside: the inside corner collects leaves and splash water, so it needs the full slope, not a flat spot.

3. Pool-side platform: 8 ft wide, flush with the pool edge

The pool-side platform is a straight run built flush with the pool coping, so you step from deck to water with no step down. The deck boards run perpendicular to the pool edge, and the outer edge carries a railing or a step down to the yard. This is the layout most 8×20 pool plans are really for. Best for: inground pools where the deck is the main entry and exit. Downside: the boards closest to the water stay wet the longest, so the material and the gap matter more here than on any other layout.

All 3 layouts use the same framing list in the next section. Only the footing positions and the rim board cuts change.

How to Measure Your Pool Area in 4 Steps

Measure twice, order once. Four measurements decide whether an 8×20 plan fits your yard.

  1. Measure the pool edge. Measure the straight pool edge where the deck will sit. An 8×20 deck needs a 20 ft straight run. If your pool edge is 18 ft, the deck overhangs 1 ft at each end, which looks fine but needs end support.
  2. Measure the setback. Measure from the pool edge to the property line, the fence, and the house. You need 8 ft of depth plus 3 ft of clear space behind the deck for access. That is 11 ft from the pool edge to the nearest obstruction.
  3. Check the fall. Stretch a string line from the pool edge to 8 ft out and measure the drop with a line level. A deck that drains away from the pool needs at least 1 in. of fall over the 8 ft run. Less than that means regrading before you build.
  4. Mark the utilities. Mark the pump, filter, and skimmer locations. The deck needs a removable panel or a hatch over any equipment you service more than once a year. A pump buried under fixed boards costs 2 to 3 hours of deck removal at every service.

Worked example: a 12×24 ft rectangular pool with the deck on one 24 ft side. The 20 ft deck centers on the pool edge with 2 ft of pool edge showing at each end. The yard is 14 ft deep from pool edge to fence, so the 8 ft deck plus 3 ft of access fits with 3 ft to spare. The string line shows 2 in. of fall over 8 ft, which is 1/4 in. per ft, exactly the drainage fall the plan needs.

Framing an 8×20 Deck: 16 Joists, 2 Beams, 6 Footings

The framing list for a freestanding 8×20 deck is short: 17 deck boards, 16 joists, 2 beams, 6 posts, and 6 footings. Here is how each number is worked out.

Deck boards: 17. Standard deck boards are 5-1/2 in. wide with a 3/16 in. gap between boards. Each board plus its gap covers 5-11/16 in. Divide the 96 in. deck width by 5-11/16 in. and you get 16.9, so 17 boards. Each board is 20 ft long, so the deck needs 340 linear ft of decking. Buy 19 boards to cover cuts and one bad board.

Joists: 16. Joists run the 8 ft width at 16 in. on center. A 20 ft length divided by 16 in. gives 15 spaces, which means 16 joists. Use 2×8 pressure-treated joists: a 2×8 Southern Pine joist at 16 in. on center spans up to 11 ft 10 in., so the 8 ft span has 3 ft 10 in. of headroom. That headroom is what keeps the deck from feeling springy underfoot.

Beams and footings: 2 beams, 6 footings. Two beam lines run the 20 ft length, one near each end of the joists. Each beam sits on 3 posts, spaced about 6 ft 8 in. apart, and each post sits on a footing. That is 6 footings total. Footing depth follows your local frost line, so check your local code before you dig. A footing that stops above the frost line heaves in the first hard winter and lifts the deck boards with it.

Rim boards: 2 pieces, 20 ft long. One rim board caps each long edge of the deck. If the deck attaches to the house on one long side, that side uses a ledger board with flashing instead of a rim board. Flashing between the ledger and the house is not optional: without it, water sits against the house framing and rots it from the inside.

Time budget: a 2-person crew frames an 8×20 deck in 6 to 8 hours once the footings are set. Footings add a day for digging and pouring, plus curing time before you load them. A first-time DIY builder should budget 2 full days for framing, not one.

What an 8×20 Deck Costs in 5 Materials

An 8×20 deck costs $640 to $6,080 installed for the surface alone, before footings, framing lumber, railing, and permits. The material sets the price more than anything else in the plan.

Material Installed $/sq ft 160 sq ft total 10-year cost
Acrylic overlay $4 to $12 $640 to $1,920 $1,280 to $3,840
Broom concrete $6 to $12 $960 to $1,920 $960 to $1,920
Concrete pavers $12 to $20 $1,920 to $3,200 $2,400 to $4,000
Travertine pavers $18 to $30 $2,880 to $4,800 $2,880 to $4,800
Capped composite $22 to $38 $3,520 to $6,080 $3,520 to $6,080

The 10-year column adds one mid-life spend where it applies. An acrylic overlay usually needs a recoat at year 7 to 10, priced at the same $4 to $12 per sq ft as the first coat. Pavers need a re-sand and re-seal at about year 5, which adds roughly $3 to $5 per sq ft. Broom concrete, travertine, and capped composite carry no mid-life resurfacing in this table, which is why their 10-year cost equals the install cost. Sealing costs and local labor move every number in this table, so treat it as a planning range, not a quote.

What the table leaves out: framing lumber and footings run $800 to $1,500 for an 8×20 wood deck. A railing on the open sides adds $30 to $60 per linear ft. Permits run $150 to $500 in most towns. None of those change with the surface material, so they do not change the ranking.

Two cost facts worth knowing before you pick: light travertine typically runs about 20 to 30 degrees F cooler than concrete pavers in full sun, which matters on a small deck where every step is barefoot. And a contractor quote for pavers often excludes the edge restraints and the polymeric sand, so ask whether both are in the number before you compare quotes.

The Pool Version: 4 Changes an 8×20 Plan Needs

A generic 8×20 deck plan becomes a pool deck plan with 4 changes. Skip any one of them and the deck works as a patio but fails as a pool deck.

1. Slope the deck away from the pool. Pool decks must drain away from the pool or toward deck drains. The code sets minimum slopes by surface: 1/8 in. per ft for textured concrete and residential pavers, 1/4 in. per ft for exposed aggregate, and a 1/2 in. per ft maximum for any deck surface. On an 8 ft deep deck, 1/4 in. per ft means the far edge sits 2 in. lower than the pool edge. A deck that slopes toward the pool sends splash water, dirt, and chemicals straight back into the water.

2. Pick a surface that grips when wet. Deck, ramp, coping, and step surfaces must be slip resistant, and where a surface is tested wet the code floor is a wet DCOF of 0.42. Concrete pavers test 0.55 to 0.70 wet, well above that floor. Capped composite tests 0.32 to 0.45 wet, which means many composite boards fall below 0.42 when wet. The 0.55 figure you see quoted for pool decks is a generally accepted target for exterior wet surfaces, not a code requirement, so do not reject a material for missing 0.55 and do not accept one for clearing 0.42 without checking its own test data. Acrylic coatings and natural travertine have no published DCOF figure, so judge them by their texture and ask the supplier for a test report.

3. Gap the boards for drainage. A pool deck made of boards needs a gap that lets splash water through instead of pooling on the surface. The standard 3/16 in. gap works for composite and wood boards around a pool. A gap under 1/8 in. traps water and grows mold between boards. A gap over 1/4 in. catches bare toes and chair legs. The code even waives the minimum deck slope where decking is gapped to drain, which tells you how much the gap matters.

4. Keep the pool barrier intact. A deck beside a pool does not replace the pool barrier. If the deck is raised, the railing on the pool side and the gate to the pool need the same climb-resistant design and self-closing, self-latching gate as the rest of the barrier. The full pool deck safety codes and standards cover the barrier, the railing, and the gate rules. A deck that gives a child a step over the fence has made the pool less safe, not more fun. Check your local pool barrier rules before you frame the outer edge.

3 Mistakes That Cost $1,000 or More to Fix

Three mistakes show up on 8×20 pool decks more than any others, and each one costs at least $1,000 to fix after the deck is built.

Wrong slope direction. A deck sloped toward the pool sends every splash back into the water and leaves a wet strip along the coping that never dries. Fixing it means lifting the surface and regrading the base, which runs $1,200 to $2,500 for a 160 sq ft deck. Check the fall with a string line before you order a single board.

Composite boards with no wet-slip check. A capped composite deck that tests 0.32 wet is slicker than the code floor of 0.42, and the first person who slips on it will tell you so. Re-decking 160 sq ft in a grippier material runs $3,500 to $6,000 plus disposal of the old boards. Ask for the maker’s wet DCOF sheet before you buy, not after the first slip. If the pool is above ground instead of inground, the framing changes too, so read the above-ground pool deck plans before you pick a surface.

Footings above the frost line. A footing that stops short of the frost line heaves in winter and drops in spring, and the deck goes out of level by 1 to 2 in. over a season. Re-leveling means jacking the deck, digging out the shallow footings, and pouring new ones, which runs $1,000 to $2,000 for 6 footings. Your local code states the frost depth. Dig to it.

8-Step Pre-Build Checklist

Run this list before you order materials. Every item is a yes or a measured number, not a guess.

  1. Pool edge measured: ___ ft of straight run for the 20 ft deck
  2. Setback confirmed: ___ ft from pool edge to the nearest obstruction (need 11 ft)
  3. Fall measured: ___ in. over 8 ft (need at least 1 in., target 2 in.)
  4. Material picked and wet DCOF checked: ___ (pavers 0.55 to 0.70, composite 0.32 to 0.45)
  5. Board count: 17 boards at 20 ft, plus 2 extra for cuts
  6. Joists: 16 joists, 2×8, 16 in. on center
  7. Footings: 6, dug to local frost depth of ___ in.
  8. Permit and barrier check: permit number ___ / barrier gate self-closing and self-latching

Editorial Note: This guide was researched and written by our small editorial team under the pen name Dave Hendrick. We are homeowners and researchers, not licensed contractors. Prices are typical national ranges, not quotes — confirm locally before you buy.

6 Questions About 8×20 Deck Plans

How many deck boards do I need for an 8×20 deck?

17 boards at 20 ft long, using standard 5-1/2 in. boards with a 3/16 in. gap. Buy 19 to cover cuts and one bad board. That is 340 linear ft before waste.

How much does an 8×20 deck cost?

$640 to $6,080 for the surface installed, depending on material. Broom concrete is $960 to $1,920, concrete pavers $1,920 to $3,200, travertine $2,880 to $4,800, and capped composite $3,520 to $6,080. Framing, footings, railing, and permits add $1,000 to $2,500 on top.

Can an 8×20 deck go beside an inground pool?

Yes, with 4 changes: slope it away from the pool at 1/8 to 1/4 in. per ft, pick a surface that grips when wet, gap the boards at 3/16 in. for drainage, and keep the pool barrier and gate intact. The pool version costs the same to frame; only the surface choice and the slope change.

Do I need a permit for an 8×20 deck?

Most towns require a permit for a deck of 160 sq ft, and every town requires one for a deck beside a pool or a deck over 30 in. above grade. Permit fees run $150 to $500. Check with your local building department before you dig, because the permit sets your footing depth and your barrier rules.

What size joists do I need for an 8 ft wide deck?

2×8 joists at 16 in. on center. A 2×8 Southern Pine joist spans up to 11 ft 10 in. at that spacing, so an 8 ft span is well inside the limit. Step up to 2×10 only if you plan a hot tub or a heavy outdoor kitchen on the deck.

How much slope does an 8×20 pool deck need?

At least 1/8 in. per ft for textured concrete or residential pavers, and 1/4 in. per ft for exposed aggregate, with a 1/2 in. per ft maximum. On an 8 ft run that is 1 to 2 in. of total fall away from the pool or toward deck drains.